Structural Engineering
Shoring
Excavation & Earth-Support Design
Lateral earth-support and temporary bracing design — shoring plans signed and sealed for permit.
What We Deliver
- PE-signed shoring and earth-support plans
- Lateral earth-pressure and bracing design
- Underpinning coordination with the geotechnical engineer
- Signed & sealed shoring plans for permit
- One coordinated response to AHJ comments
Who It’s For
- Excavation and foundation contractors
- General contractors on deep-excavation or adjacent-structure projects
- Developers requiring permitted shoring for the building department
- Teams protecting adjacent structures during excavation
Engineering Scope
- Lateral Earth Support: Soldier piles, lagging, sheet piles, and tieback or bracing layout
- Temporary Bracing: Internal bracing and waler design for the excavation
- Underpinning: Coordination of underpinning to protect adjacent foundations
- Monitoring: Movement-monitoring recommendations where warranted
- Geotechnical Coordination: Soil parameters and earth pressures from the geotech report
- Permit Package: Signed & sealed shoring plans
Compliance Notes (Florida)
- FBC: Florida Building Code excavation and foundation provisions
- OSHA (29 CFR 1926 Subpart P): Excavation and protective-system references
- ASCE 7: Loads where surcharge or adjacent structures govern
- Geotechnical report: Soil strength and earth-pressure parameters
Ready to keep your excavation safe and permitted — with sealed shoring plans?
Ready for Shoring?
Contact us today for a consultation. PE-signed plans delivered with fast turnaround across South Florida.
Contact Us